The project was awarded to MTCC in March 2016, and implementation began in December 2016.
“This project included:
– Sand fill to as per the drawing provided to MSL+1.4m 11,219 .0Cbm
– Construction and installation of concrete culvert (width-6m, length-15m, with wing walls) 6.0Nos
– Sand cement revetment at both sides of the causeway 882.0 M
– Cast and Installation of L-Carbs 882.0 M”
MTCC: G.DH. MADAVELI AND HOADEDHOO CAUSEWAY [Image: MTCC]